Asset Report

Kurovdag

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Kurovdag field is located onshore Azerbaijan and has historically been the largest oil field in the Lower Kura Province. Kurovdag was first developed during the Soviet era and is now very mature. International operators have undertaken rehabilitation work at the field since 1995, with mixed results. An initial contract was signed with a British company, Whitehall International Traders (later renamed Caspian Energy Group (CEG)). However, CEG was bought out by GCM Global Energy in 2008, ...

What's included

This report contains

  • Document

    Kurovdag

    PDF 418.83 KB

  • Document

    Kurovdag

    XLS 607.00 KB

  • Document

    Kurovdag

    ZIP 947.43 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Historical participation (1995-2008)
    • Shirvan Operating Company (2008 onwards)
  • Geology
  • Exploration
  • Reserves and resources
  • Production
    • Key development metrics
    • Historical development (1995-2008)
    • GCM Global Energy development (2009 onwards)
  • Infrastructure
  • Sales contracts
    • Bonuses
    • Royalty
    • Cost recovery
    • Profit distribution
    • Local market obligation (LMO)
    • Profit tax
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

Tables

  • Key facts: Table 1
  • Geology: Table 1
  • Geology: Table 2
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Participation: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Fiscal and regulatory: Table 1
  • Costs: Table 3

Images

  • Index map
  • Kurovdag map
  • Kurovdag PSC production profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800