Asset report

L/10-L/11a

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The L/10 L/11a area includes a cluster of fields developed through the use of fifteen fixed steel platforms and four subsea tie backs operated by GDF Suez. As production from the main field has declined since the mid 1980s a number of incremental and satellite projects have been developed.The L/10 M field was discovered in 1999 and brought onstream in August 2000. Gas is transported via the Noordgastransport (NGT) pipeline to Uithuizen. We have included a separate cash flow for the L/10 M ...

What's included

This report contains

  • Document

    L/10-L/11a

    PDF 680.96 KB

  • Document

    L/10-L/11a

    XLS 1.27 MB

  • Document

    L/10-L/11a

    ZIP 1.78 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 41 images and tables including:

Images

  • Index Map
  • L/10-L/11a Map
  • Production Profile L/10-L/11a
  • Production Profile L/10-M
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Geology: Table 1
  • Geology: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Development: Table 1
  • Development: Table 2
  • Development: Table 3
  • Development: Table 4
  • Participation: Table 1
  • Production: Table 1
  • Production: Table 2
  • L/10 - L/11a
  • Costs: Table 2
  • L/10-M
  • L/10 - L/11a
  • L/10-M
  • Cash Flow L10 & L11a (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cash Flow L10 & L11A (€ millions)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Cash Flow L10M ($US million)
  • Economic analysis: Table 8
  • Economic analysis: Table 9
  • Cash Flow L10M (€ millions)
  • Economic analysis: Table 11
  • Economic analysis: Table 12

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898