Asset report

L/8b and L/5c

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The L/8b licence contains a small gas field L/8 P which was developed as a satellite to the gas processing facilities on the L/8a licence. In 1996 and 1998 two further gas discoveries L/8 P4 and L/8 A (West) were made on the part block and the L/8 P4 platform was installed to process all production from the licence. The L/8 P4 and L/8 A (West) fields were both brought onstream in early 2001. Gas is exported via a dedicated pipeline connection to the Noordgastransport (NGT) system.The ...

What's included

This report contains

  • Document

    L/8b and L/5c

    PDF 582.93 KB

  • Document

    L/8b and L/5c

    XLS 1.03 MB

  • Document

    L/8b and L/5c

    ZIP 1.47 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 36 images and tables including:

Images

  • Index Map
  • L/8b & L/5cMap
  • L/8b Production Profile
  • L/5c Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Geology: Table 1
  • Geology: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Development: Table 1
  • Participation: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • L/8b Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • L/8b Cash Flow (€ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • L/5c Cash Flow (US$ million)
  • Economic analysis: Table 8
  • Economic analysis: Table 9
  • L/5c Cash Flow (€ million)
  • Economic analysis: Table 11
  • Economic analysis: Table 12

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898