Asset report

Limau

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Limau area covers a group of eight fields located on PERTAMINA's South Sumatra and Jambi contract area. The fields were licensed as the Limau EOR contract during 1989-2004, and have been under PERTAMINA EP since 2005. A KSO contract for the ASP injection on several reservoirs was signed in 2013, but was terminated in 2016. Full-scale secondary recovery began in 1991, with incremental oil production from three fields: Limau Niru, Limau Timur Seksi Q-22 and Limau Timur Seksi P. In 1994, Limau Timur Seksi Q-51, Barat, Tengah, Karangan and Belimbing fields were also brought into secondary production.

What's included

This report contains

  • Document

    Limau

    PDF 8.81 MB

  • Document

    Limau

    XLS 517.50 KB

  • Document

    Limau

    ZIP 9.25 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Reserves and resources
  • Production
    • 1991 to 1996
    • 1998 onwards
  • Infrastructure
  • Costs
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 21 images and tables including:

Images

  • Index Map
  • Limau Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3

You may be interested in

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898