Asset report

Litchendjili

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Litchendjili Block is situated on the Congolese shelf in a water depth of 40 metres. It contains one commercial field Litchendjili which has oil gas and condensate reserves. The development licence was carved out in 2012 from the Marine XII block.A milestone was the signature of a gas sales agreement (GSA) in 2008. Litchendjili came on stream in June 2015 via an unmanned wellhead platform (WHP). Oil gas and condensate is transported to an onshore treatment plant near Djeno for ...

What's included

This report contains

  • Document

    Litchendjili

    PDF 8.11 MB

  • Document

    Litchendjili

    XLS 615.00 KB

  • Document

    Litchendjili

    ZIP 8.63 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Phase 1
    • Phase 1 Bis
    • Phase 2
  • Infrastructure
    • Capital Costs
    • Operating Costs
  • Sales contracts
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

Images

  • Index Map
  • Litchendjili Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

Fayoum Fields

Asset report

Tinrhert Fields

Asset report

Ohanet

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898