Asset report

NC193

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The NC193 fields are located near Total's Mabruk field in the west of the Sirte Basin 140 kilometres southwest of the As Sidrah terminal. In 2010 RWE Dea forecast first production by 2014 but we now expect this to be delayed until next decade due to the adverse political and security situation in Libya. Oil production once onstream will be transported by pipeline via Total's Mabruk field to the As Sidrah oil terminal on the Mediterranean coast.

What's included

This report contains

  • Document

    NC193

    PDF 5.20 MB

  • Document

    NC193

    XLS 372.00 KB

  • Document

    NC193

    ZIP 5.51 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 10 images and tables including:

Images

  • Index Map
  • NC193 Fields Map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Infrastructure: Table 1
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Economic analysis: Table 1

You may be interested in

Asset report

Sebou Fields

Asset report

East Zeit

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898