Asset report

OML 109 (Ejulebe Field)

From

$1,700.00

You can pay by card or invoice

Get this report

From

$1,700.00

You can pay by card or invoice

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

OML 109 is located offshore, in the western part of Niger Delta. In 1991, Atlas Petroleum International, an indigenous company, was awarded the block in 1996, as Oil Prospecting Lease (OPL) 75 under indigenous concession terms. Following the discovery of the Ejulebe field, the licence was converted into Oil Mining Lease (OML) 109 in 1996. The operator has since divided OML 109 into two operation areas: the OML 109 exploration area and the Ejulebe development area. The Ejulebe field is the ...

What's included

This report contains

  • Document

    OML 109 (Ejulebe Field)

    PDF 5.08 MB

  • Document

    OML 109 (Ejulebe Field)

    XLS 697.50 KB

  • Document

    OML 109 (Ejulebe Field)

    ZIP 5.69 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Historical Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Exploration Costs
    • Capital Costs
    • Operating Costs
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 24 images and tables including:

Images

  • Index Map
  • OML 109 Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Exploration: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Participation: Table 2
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

Sebou Fields

Asset report

Area 47

Asset report

Alamein Yidma

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898