Asset Report
OML 38 (Egbaoma)
This report is currently unavailable
Report summary
The Egbaoma field is located in the northern onshore Niger Delta. The field used to be located on OML 38 in the Shell/NNPC Joint Venture, but was never developed because of its small size. Asuokpu/Umutu (as it was then known) was awarded to an indigenous joint venture of Platform Petroleum and Newcross Petroleum. The field was brought onstream in 2007 and was the first 'marginal field' to reach this milestone. In 2011, Asuokpu/Umutu ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Gas monetisation via OB3
- Oil evacuation constraints
- Petroleum Industry Act
- Location maps
- Participation
- Geology
- Well data
- Exploration
- Reserves and resources
-
Production
- Emissions
-
Development
- Upstream development
- Midstream gas processing plant
- Infrastructure
-
Costs
- Capital costs
- Operating costs
- Sales contracts
-
Fiscal and regulatory
-
PIA fiscal terms
- Royalty
- Tax
- Pre-PIA fiscal terms
- Farm-out Agreements
-
PIA fiscal terms
-
Economic assumptions
- Discount rate and date
- Inflation rate
- Oil price
- Tariff receipts
- Global Economic Model (GEM) File
- Economic analysis
Tables and charts
This report includes 26 images and tables including:
- Key facts: Table 1
- Index Map
- Egbaoma Map
- Participation: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Reserves and resources: Table 2
- Production: Table 1
- Production: Table 2
- Production Profile
- Infrastructure: Table 1
- Sales contracts: Table 1
- Cash flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2024)
- Remaining PV Price Sensitivities
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Fiscal and regulatory: Table 3
- Fiscal and regulatory: Table 1
- Fiscal and regulatory: Table 2
What's included
This report contains:
Other reports you may be interested in
Asset Report
Oued Amizour (Tala Hamza) zinc mine project
A detailed analysis along the production and commercialisation chain of the Oued Amizour (Tala Hamza) zinc mine project.
$2,250
Asset Report
Twangiza gold mine
A detailed analysis of the Twangiza gold mine.
$2,250
Asset Report
Asmara copper mine project
A detailed analysis of the Asmara copper mine project.
$2,250