Asset report

Pertamina EP - Kalimantan

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

PERTAMINA EP's Kalimantan acreage is spread across multiple areas in the Tarakan Kutei and Barito basins. Oil and gas production started from some of these fields as early as 1929 and as a result most of the fields are very mature. Following the expiry of the Talisman operated Tanjung Raya EOR (Enhanced Oil Recovery) contract in November 2004 the Tanjung field became part of PERTAMINA EP's Kalimantan operations. In October 2008 the Sanga Sanga Samboja and Tarakan (Shallow) ...

What's included

This report contains

  • Document

    Pertamina EP - Kalimantan

    PDF 804.18 KB

  • Document

    Pertamina EP - Kalimantan

    XLS 662.00 KB

  • Document

    Pertamina EP - Kalimantan

    ZIP 1.35 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 27 images and tables including:

Images

  • Index Map
  • Pertamina Kalimantan Map A
  • Pertamina Kalimantan Map B
  • Pertamina Kalimantan Map C
  • Pertamina Kalimantan Map D
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Sales contracts: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3

You may be interested in

Asset report

South East Sumatra

Asset report

Tuban (PPEJ)

Asset report

Pase

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898