This report is currently unavailable
Why buy this report?
This asset report contains essential background information, significant issues and other factors that affect the important Petro San Felix project that is one of the first to be brought on-stream for Venezuela’s Orinoco oil belt production. Along with location maps and geological information you'll get:
- Development background including both oil and gas infrastructure
- Information on sales contracts
- Facts relating to fiscal policy and regulatory factors that are important to consider when evaluating opportunities in the region.
Report summary
Petro San Félix (formerly Petroanzoátegui and previously Petrozuata) was the first field brought onstream in the Venezuela's Orinoco heavy oil belt (the Faja). In 2000, the field was integrated to a project involving the extraction and upgrading of extra-heavy oil (XHO) into synthetic crude (syncrude) for export. In 2007, the government brought all contracts in line with the 2001 Hydrocarbon Law, which states that PDVSA must hold a majority interest in each oil project. At ...
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
- Participation
- Geology
- Exploration
- Reserves and resources
-
Production
- Initial production phase (1998 to 2001)
- Syncrude production phase (2001 to present)
- Gas production
-
Development
- Wells
- Drilling
- Zuata III
-
Infrastructure
- Field facilities
- Transportation
- Upgrader
- Solids facilities
- Future plans
-
Costs
- Exploration costs
- Capital costs
- Operating costs
- Sales contracts
-
Fiscal and regulatory
- Royalty
- Corporate income taxes
- Windfall taxes
-
Economic assumptions
- Cash flow
- Discount rate and date
- Inflation rate
- Oil price
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 20 images and tables including:
- Key facts: Table 1
- Index Map
- Detail Map
- Participation: Table 1
- Geology: Table 1
- Reserves and resources: Table 1
- Cash Flow
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2024
- Remaining Present Value Price Sensitivities
- Production: Table 1
- Production: Table 2
- Production Profile
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Fiscal and regulatory: Table 1
What's included
This report contains:
Other reports you may be interested in
Asset Report
Panantza copper mine project
A detailed production, commercial and competitive analysis of the Panantza copper mine project.
$2,250
Asset Report
San Jorge copper mine project
A detailed analysis of the San Jorge copper mine project.
$2,250
Asset Report
Vizcachitas copper mine project
A detailed analysis of the Vizcachitas copper mine project.
$2,250