Asset report

Pickerill

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Pickerill gas field is located 17 kilometres south of the BP-operated West Sole field. It was first discovered by a Conoco-operated group with well 48/11b-4, in 1984. An eastward extension of the field into ARCO-operated block 48/11a was established by well 48/11a-7 in 1986. In 1987 British Gas established a further eastward extension of the reservoir into neighbouring block 48/12c.Two platforms have been used in the development Pickerill. Both are not normally manned, minimal ...

What's included

This report contains

  • Document

    Pickerill

    PDF 4.21 MB

  • Document

    Pickerill

    XLS 762.00 KB

  • Document

    Pickerill

    ZIP 4.85 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
    • Development Approval after 1 April 1982 but prior to 15 March 1993
    • Economic Assumptions
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Exchange rate
    • Fiscal terms
    • Global Economic Model (GEM) file
    • Cash Flow

Tables and charts

This report includes 24 images and tables including:

Images

  • Index Map
  • Pickerill Map
  • Pickerill Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Development: Table 1
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cash Flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6

You may be interested in

Asset report

Mariner

Asset report

Ravenspurn North

    
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898