Asset report

Pickerill

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The Pickerill gas field is located 17 kilometres south of the BP operated West Sole field. It was first discovered by a Conoco operated group with well 48/11b 4 in 1984. An eastward extension of the field into ARCO operated block 48/11a was established by well 48/11a 7 in 1986. In 1987 British Gas established a further eastward extension of the reservoir into neighbouring block 48/12c.Two platforms have been used in the development Pickerill. Both are not normally manned minimal ...

What's included

This report contains

  • Document

    Pickerill

    PDF 3.86 MB

  • Document

    Pickerill

    XLS 762.00 KB

  • Document

    Pickerill

    ZIP 4.50 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
    • Development Approval after 1 April 1982 but prior to 15 March 1993
    • Economic Assumptions
    • Cash flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Gas price
    • Exchange rate
    • Fiscal terms
    • Global Economic Model (GEM) file
    • Cash Flow

Tables and charts

This report includes 24 images and tables including:

Images

  • Index Map
  • Pickerill Map
  • Pickerill Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Development: Table 1
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Cash Flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6

You may be interested in

Asset report

Liverpool Bay

Asset report

Tyra Area

    
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898