Asset Report

Platypus

Get this report

$2,900

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

01 January 2019

Platypus

Report summary

Platypus is located in the Southern Gas Basin and lies around 24 kilometres southeast of the Cleeton field. It will be developed with two wells and a normally unmanned installation (NUI) platform. We assume that Platypus will tie-back to the Cleeton field via a new-build 24 kilometre pipeline. Gas will then be transported along the Cleeton-Dimlington pipeline to the Perenco-operated Dimlington Gas Terminal.We assume that Platypus will reach FID in mid-2019, with first production in mid-2021.

Table of contents

Tables and charts

This report includes 22 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Detail Map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production Profile
  • Development: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Economic analysis: Table 1
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2019
  • Remaining PV Price Sensitivities
  • Economic analysis: Table 4
  • Economic analysis: Table 5
  • Economic analysis: Table 6

What's included

This report contains:

  • Document

    Platypus

    PDF 4.66 MB

  • Document

    Platypus

    XLS 700.00 KB

  • Document

    Platypus

    ZIP 5.20 MB

Trusted by leading organisations