Asset report

PNGF Kombi-Likalala-Libondo

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

The offshore Congo Kombi-Likalala-Libondo licence consists of three fields. The Kombi and Likalala fields were developed in 1999 using minimum-facilities wellhead platforms. The Libondo field, which came onstream in 2011, is tied back to the Likalala field. In 2008 and 2009, Total drilled two wells on each of the Kombi and Likalala fields, and between 2010 and 2011, four wells were drilled on Libondo.

What's included

This report contains

  • Document

    PNGF Kombi-Likalala-Libondo

    PDF 7.35 MB

  • Document

    PNGF Kombi-Likalala-Libondo

    XLS 521.50 KB

  • Document

    PNGF Kombi-Likalala-Libondo

    ZIP 7.78 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Kombi
    • Likalala
    • Libondo
  • Infrastructure
    • Exploration Costs
    • Abandonment Costs
    • Capital Costs
    • Operating Costs
    • Tariff
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Global Economic Model (GEM) Filename
  • Economic analysis

Tables and charts

This report includes 21 images and tables including:

Images

  • Index Map
  • Kombi-Likalala-Libondo Map
  • Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3

You may be interested in

Asset report

Alam El Shawish East

Asset report

Chergui

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898