Q/1-D
Loading current market price
Report summary
The Q/1-D gas field was discovered by Wintershall in 2008 with the Q/1-27 exploration well drilled 12 kilometres north of the Q/1-B field. An appraisal well followed in 2009 before the development decision was taken. In March 2014, the Q/1-28 appraisal well was completed as producer and brought onstream. The P/6-S Multi Purpose Platform (MPP) has been re-used on the development. In 2014, the Q/1-D-02 appraisal well was drilled and subsequently side-tracked. The side-track well was ...
What's included
This report contains
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Location maps
-
Participation
- Historical licensing and corporate activity
- Geology
- Well data
- Exploration
- Reserves and resources
- Production
- Development
- Infrastructure
-
Costs
- Capital Costs
- Operating Costs
- Sales contracts
- Fiscal and regulatory
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Gas price
- Exchange rate
- Fiscal Terms
- Global Economic Model (GEM) file
-
Economic analysis
- Cash flow
Tables and charts
This report includes 24 images and tables including:
Images
- Index Map
- Q/1-D Map
- Production Profile
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
- Remaining PV Price Sensitivities
Tables
- Key facts: Table 1
- Participation: Table 1
- Geology: Table 1
- Well data: Table 1
- Reserves and resources: Table 1
- Production: Table 1
- Production: Table 2
- Costs: Table 1
- Costs: Table 2
- Costs: Table 3
- Q/1-D Cash Flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Q/1-D Cash Flow (€ million)
- Economic analysis: Table 5
- Economic analysis: Table 6
You may be interested in
Questions about this report?
-
Europe:+44 131 243 4699
-
Americas:+1 713 470 1900
-
Asia Pacific:+61 2 8224 8898