Asset report

Rough Gas Storage

From

$1,700.00

Get this report

From

$1,700.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The Rough gas field was originally developed and operated by British Gas. Production started in 1976 and in 1985 following assessment of the reservoir's potential the field was converted to a gas storage facility. Gas from the National Transmission System (NTS) is injected into the reservoir at times of low demand (e.g. summer) and the field provides a peak shaving facility during periods of high demand in winter. Rough is the largest gas storage facility in the UK with a total ...

What's included

This report contains

  • Document

    Rough Gas Storage

    PDF 536.41 KB

  • Document

    Rough Gas Storage

    XLS 230.50 KB

  • Document

    Rough Gas Storage

    ZIP 732.11 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 7 images and tables including:

Images

  • Index Map
  • Rough Map

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Infrastructure: Table 1
  • Development: Table 1

You may be interested in?

Asset report

Loma Negra Area

Asset report

El Trapial Area

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898