Asset Report

Rough Gas Storage

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Rough gas field was originally developed and operated by British Gas. Production started in 1976, and in 1985 following assessment of the reservoir's potential, the field was converted to a gas storage facility. Gas from the National Transmission System (NTS) is injected into the reservoir at times of low demand (e.g. summer) and the field provides a peak shaving facility during periods of high demand in winter. Rough is the largest gas storage facility in the UK, with a total ...

What's included

This report contains

  • Document

    Rough Gas Storage

    PDF 536.38 KB

  • Document

    Rough Gas Storage

    XLS 230.50 KB

  • Document

    Rough Gas Storage

    ZIP 732.12 KB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Platforms
    • Development drilling
  • Infrastructure
    • Capital Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 7 images and tables including:

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Well data: Table 1
  • Infrastructure: Table 1
  • Development: Table 1

Images

  • Index Map
  • Rough Map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898