Asset Report

Rough Gas Storage

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

26 June 2017

Rough Gas Storage

Report summary

The Rough gas field was originally developed and operated by British Gas. Production started in 1976, and in 1985 following assessment of the reservoir's potential, the field was converted to a gas storage facility. Gas from the National Transmission System (NTS) is injected into the reservoir at times of low demand (e.g. summer) and the field provides a peak shaving facility during periods of high demand in winter. Rough is the largest gas storage facility in the UK, with a total ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • Platforms
    • Development drilling
  • Infrastructure
    • Capital Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 7 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Rough Map
  • Participation: Table 1
  • Well data: Table 1
  • Infrastructure: Table 1
  • Development: Table 1

What's included

This report contains:

  • Document

    Rough Gas Storage

    PDF 456.28 KB

  • Document

    Rough Gas Storage

    XLS 230.50 KB

  • Document

    Rough Gas Storage

    ZIP 643.38 KB

Other reports you may be interested in

Browse reports by Industry Sector