Asset report

Sengkang (LNG)

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Sengkang PSC comprises a number of gas fields located onshore southern Sulawesi, of which the largest, Kampung Baru, has been onstream since 1997. The Sengkang project is the first integrated private power and gas development in Indonesia. The gas from the Kampung Baru field is piped to an independent power plant which supplies electricity to the local grid. The project suffered from the depreciation of the Rupiah in 1997 and consequent competition from government-subsidised fuel oil ...

What's included

This report contains

  • Document

    Sengkang (LNG)

    PDF 9.24 MB

  • Document

    Sengkang (LNG)

    XLS 747.50 KB

  • Document

    Sengkang (LNG)

    ZIP 9.89 MB

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
    • Ownership changes
    • Contract extension and relinquishments
  • Well data
  • Exploration
  • Reserves and resources
    • Kampung Baru
    • Walanga, Sampi Sampi and Bonge
    • Kampung Baru
    • Wasambo Upstream Development and Sengkang LNG Plant
  • Infrastructure
    • Exploration Costs
    • Operating Costs
    • Initial contract
    • Take-or-pay compensation
    • Price revisions and current pricing
    • Mini-LNG
  • Fiscal and regulatory
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Gas Price
    • Global Economic Model (GEM) Filename
    • Indicative technical valuations

Tables and charts

This report includes 26 images and tables including:

Images

  • Index Map
  • Sengkang Map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining Present Value Price Sensitivities
  • Production Profile

Tables

  • Key facts: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Infrastructure: Table 1
  • Cash Flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Participation: Table 1
  • Production: Table 1
  • Production: Table 2
  • Costs: Table 1
  • Capital Costs
  • Costs: Table 3
  • Costs: Table 4
  • Sales contracts: Table 1
  • Sales contracts: Table 2
  • Economic analysis: Table 4

You may be interested in

Asset report

G10/48 (Wassana)

Asset report

SB K (Kikeh)

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898