Asset Report

Suceava

From

$1,700.00

You can pay by card or invoice

From

$1,700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The Suceava licence lies to the east and southeast of the Brodina licence and comprises three onstream gas fields; Climauti, Dornesti Sud and Ruda. Climauti and Ruda are tied back to the Bilca gas facilities, while Dornesti Sud-1 has been developed as an onsite gas-to-power generation facility.From the Bilca production facilities, gas is exported 17 kilometres to the Radauti pressure reduction station, where it enters the Transgaz transmission grid.

What's included

This report contains

  • Document

    Suceava

    PDF 9.50 MB

  • Document

    Suceava

    XLS 194.50 KB

  • Document

    Suceava

    ZIP 9.65 MB

Table of contents

Tables and charts

This report includes 11 images and tables including:

Tables

  • Key facts: Table 1
  • Suceava
  • Economic analysis: Table 2
  • Economic analysis: Table 3

Images

  • Index map
  • Suceava map
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities

You may be interested in

Asset Report

Geopetrol other fields

Asset Report

Sterling

Asset Report

Konzi and M`Boumba

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898