Asset report

TFR/TIM/BEQ Fields

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

The TFR TIM and BEQ fields are located in the southeast region around fifty kilometres south of the Tin Fouye Tabankort field. Repsol YPF was awarded an exploration licence for the Erg Issaouane area covering Blocks 226a 228a 229a and 238a in December 1990. Three discoveries were made in the area between 1993 and 1996. These were TFR (Tifernine) TIM (Tin Mesnaguene) and BEQ (Bir El Qattara). Production commenced from the TFR field in December 1998. Production start up from the TIM ...

What's included

This report contains

  • Document

    TFR/TIM/BEQ Fields

    PDF 6.01 MB

  • Document

    TFR/TIM/BEQ Fields

    XLS 882.50 KB

  • Document

    TFR/TIM/BEQ Fields

    ZIP 6.77 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
  • Costs
  • Fiscal and regulatory
  • Economic assumptions
  • Economic analysis

Tables and charts

This report includes 31 images and tables including:

Images

  • Index Map
  • TFR/TIM/BEQ Map
  • Pre 2012 Production Profile
  • Post 2012 Sonatrach Operated Production Profile
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018

Tables

  • Key facts: Table 1
  • Participation: Table 1
  • Participation: Table 2
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Post Contract Sonatrach Operated Phase
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Pre-2012 Repsol Operated Phase
  • Economic analysis: Table 5
  • Economic analysis: Table 6

You may be interested in

Asset report

West El Manzala

Asset report

Chouech Es Saida

    
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898