Asset Report

Tungolski Block

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

21 December 2017

Tungolski Block

Report summary

The Tungolski block (Licence 61) is located in the Tomsk Oblast, 450 kilometres northwest of the city of Tomsk. It includes the Arbuzovskoye, Kondrashevskoye, Lineynoye, North Varyakhskoye, Tungolskoye and Sibkrayevskoye fields, with the latter being the biggest in the grouping. Lineynoye was brought onstream in 2010 and is connected to the Transneft system. The operator constructed a central processing facility (CPF) at the field, and Arbuzovskoye and Tungolskoye fields were tied into it. ...

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
  • Development
  • Infrastructure
    • Operating Costs
    • Oil MET
    • Oil MET reductions
    • Oil Export Duty
    • Cash Flow
    • Discount rate and date
    • Inflation rate
    • Oil price
    • Exchange rate
    • Global Economic Model (GEM) file
  • Economic analysis

Tables and charts

This report includes 23 images and tables including:

  • Key facts: Table 1
  • Index map
  • Detail map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Reserves and resources: Table 2
  • Production: Table 1
  • Production: Table 2
  • Production profile
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Costs: Table 3

What's included

This report contains:

  • Document

    Tungolski Block

    PDF 823.46 KB

  • Document

    Tungolski Block

    XLS 618.00 KB

  • Document

    Tungolski Block

    ZIP 1.32 MB

Other reports you may be interested in

Browse reports by Industry Sector