Asset Report

West El Manzala

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

14 November 2017

West El Manzala

Report summary

The West El Manzala contract area is located in the Nile Delta to the West of Lake Manzala. The area has proven to be particularly gas-prone with 14 fields discovered to date. Dana Gas has been operator of the area since its acquisition of Centurion Energy in January 2007. In addition to the West El Manzala PSC, Dana Gas also operates the El Manzala and West El Qantara PSCs, also located onshore Nile Delta. The area's wet gas fields are developed through tie-in to Dana Gas's El Wastani plant.

Table of contents

  • Key facts
    • Summary
    • Key issues
  • Location maps
  • Participation
  • Geology
  • Well data
  • Exploration
  • Reserves and resources
  • Production
    • West El Manzala Fields
    • Gas Production Enhancement Agreement (GPEA)
    • Wet Gas Treatment (El Wastani Facility)
    • Dry Gas Treatment (South El Manzala Facility)
    • Exploration Costs
    • Capital Costs
    • Operating Costs
  • Sales contracts
    • Cost/Profit Oil
    • Cost/Profit Gas
    • Bonus
    • Gas Production Enhancement Agreement (GPEA)
    • Cash Flow
    • Gas Price
    • Global Economic Model (GEM) File
  • Economic analysis

Tables and charts

This report includes 27 images and tables including:

  • Key facts: Table 1
  • Index Map
  • West El Manzala Map
  • Participation: Table 1
  • Geology: Table 1
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Production Profile
  • Sales contracts: Table 1
  • Cash flow
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Remaining PV Price Sensitivities
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Costs: Table 3
  • Costs: Table 4
  • Fiscal and regulatory: Table 1
  • Fiscal and regulatory: Table 2
  • Fiscal and regulatory: Table 3

What's included

This report contains:

  • Document

    West El Manzala

    PDF 5.75 MB

  • Document

    West El Manzala

    XLS 820.00 KB

  • Document

    West El Manzala

    ZIP 6.43 MB

Other reports you may be interested in

Browse reports by Industry Sector