Westgastransport system (WGT)
Report summary
Table of contents
- Key facts
- Summary
- Location maps
- Participation
-
Development
- WGT
-
Pipeline
- Low-Cal pipeline
- Terminal
- Throughput
-
Third party users
- Tariff Income
-
Costs
-
Capital Costs
- Abandonment Costs
- Operating Costs
-
Capital Costs
- Fiscal and regulatory
-
Economic assumptions
- Cash Flow
- Discount rate and date
- Inflation rate
- Exchange rate
- Fiscal Terms
- Global Economic Model (GEM) file
- Economic analysis
Tables and charts
This report includes 19 images and tables including:
- Key facts: Table 1
- Index Map
- Participation: Table 1
- WGT High-Cal pipeline
- Throughput: Table 2
- WGT Lo-Cal pipeline
- Throughput: Table 4
- WGT High-Cal pipeline throughput profile and maximum capacity 1977-2025
- WGT Lo-Cal pipeline throughput profile 1982-2025
- Cash Flow (US$ million)
- Economic analysis: Table 2
- Economic analysis: Table 3
- Split of Revenues
- Cumulative Net Cash Flow - Undiscounted
- Cumulative Net Cash Flow - Discounted at 10% from 01/01/2020
- Remaining Revenue Distribution (Discounted at 10% from 01/01/2020)
- Cash Flow ( million)
- Economic analysis: Table 5
- Economic analysis: Table 6
What's included
This report contains:
Other reports you may be interested in
22 July 2019
Westgastransport Pipeline Extension
Westgastransport Pipeline Extension
The Westgastransport Extension was built primarily to take gas from the Markham field to shore. Production from the K/4a, K/4b-K/5a, ...
$2,15005 September 2019
K/4b-K/5a
K/4b-K/5a
Total operates a portfolio of gas fields within the K/4b-K/5a licence, which have been developed utilising a central processing ...
$2,90007 November 2019
UK SGB decommissioned fields
UK SGB decommissioned fields
This analysis covers the decommissioned fields in the Southern Gas Basin. For historic asset reports, please contact Wood ...
$2,900Trusted by leading organisations








