Asset Report

Westgastransport system (WGT)

Get this report

$1,700

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

20 July 2016

Westgastransport system (WGT)

Report summary

High-Cal Westgastransport (WGT) pipelineThe WGT is a high-calorific gas gathering system, originally laid to evacuate gas from the NAM-operated Joint Development Area (JDA) fields and the Noordwinning group fields K/13 and K/10a. The WGT also accommodates throughput from the WGT Extension, which is used by the Markham, J3a, K/1a, K/4a, K/4b-K/5a and K/5b developments. Other fields that have been tied in are Halfweg, Q/1-B and Windermere (UK). The UK Grove, Chiswick and Stamford fields ...

Table of contents

Tables and charts

This report includes 19 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Participation: Table 1
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Revenue Distribution (Discounted at 10% from 01/01/2018)
  • Cash Flow ( million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6
  • Throughput: Table 1
  • Throughput: Table 2
  • Throughput: Table 3
  • Throughput: Table 4
  • WGT Pipeline Throughput Profile and Maximum Capacity 1977-2020
  • WGT Lo-Cal Pipeline Throughput Profile 1982-2020

What's included

This report contains:

  • Document

    Westgastransport system (WGT)

    PDF 879.21 KB

  • Document

    Westgastransport system (WGT)

    XLS 595.00 KB

  • Document

    Westgastransport system (WGT)

    ZIP 1.29 MB

Other reports you may be interested in

Browse reports by Industry Sector