Asset Report

Windermere

Get this report

$2,300

You can pay by card or invoice

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

- Available as part of a subscription
- FAQ's about online orders

27 October 2017

Windermere

Report summary

The Windermere gas field ceased production in 2015. It had been developed using a not normally manned satellite wellhead tower tied back to the Markham infrastructure approximately seven kilometres to the east. The field was developed with two production wells.Although the Windermere field lies entirely within the UK sector, all production was transported to, and marketed in, The Netherlands. Production was exported via the Markham field through the Westgastransport (WGT) Extension for ...

Table of contents

Tables and charts

This report includes 22 images and tables including:

  • Key facts: Table 1
  • Index Map
  • Windermere Map
  • Well data: Table 1
  • Reserves and resources: Table 1
  • Production: Table 1
  • Production: Table 2
  • Windermere Production Profile
  • Development: Table 1
  • Infrastructure: Table 1
  • Costs: Table 1
  • Costs: Table 2
  • Cash Flow (US$ million)
  • Economic analysis: Table 2
  • Economic analysis: Table 3
  • Split of Revenues
  • Cumulative Net Cash Flow - Undiscounted
  • Cumulative Net Cash Flow - Discounted at 10% from 01/01/2018
  • Remaining Present Value Price Sensitivities
  • Cash Flow (£ million)
  • Economic analysis: Table 5
  • Economic analysis: Table 6

What's included

This report contains:

  • Document

    Windermere

    PDF 4.09 MB

  • Document

    Windermere

    XLS 663.00 KB

  • Document

    Windermere

    ZIP 4.64 MB

Other reports you may be interested in

Browse reports by Industry Sector