Asset report

Kipushi zinc smelter project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

The Kipushi mine operated as a commercial mine up until 1993, at which time it was placed on care and maintenance. Peak production in the 1980s reached 1.5Mt/a of ore containing 143kt zinc. The reopening of the mine has been under consideration since 1996, when American Mineral Fields (AMF) – the fore-runner of Adastra Minerals - reached an agreement with Gécamines to earn up to a 50% interest in Kipushi by funding a feasibility study. In 2000 Zincor expressed interest in becoming a...

What's included

This report contains

  • Document

    Kipushi (Electrolytic) zinc smelter project

    XLS 236.00 KB

  • Document

    Kipushi zinc smelter project

    PDF 872.66 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
  • Products
  • Economic assumptions

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Kimbo bauxite mine

Asset report

Kindia bauxite mine

    
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898