Asset report

McArthur River zinc smelter project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

For further information about this report submit the form below.

Report summary

With the expansion of the McArthur river mine allied to the potential for cheap energy sources the option for a zinc smelter to process the additional concentrate appeared a good option. However the announcement that the bulk concentrate will be treated to make a saleable zinc concentrate means that a smelter at McArthur river is now extremely unlikely to happen.

What's included

This report contains

  • Document

    McArthur River zinc smelter project

    PDF 740.61 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898