Asset report

Noyelles-Godault zinc smelter

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image

Report summary

Lead production commenced at Noyelles-Godault in 1898 and there is currently a 150kt/a-lead smelter together with an associated lead refinery on site. An Imperial Smelting Furnace with an upper shaft area of 17.2m2 was commissioned in 1962. The design capacity was 35kt/a zinc.

What's included

This report contains

  • Document

    NogoZn.xls

    XLS 257.50 KB

  • Document

    Noyelles-Godault zinc smelter

    PDF 725.16 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Sinter Plant
    • Acid Plant
    • Smelting Furnace
    • Refining
    • Casting Plant
    • Slag Disposal
    • Other
  • Products
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898