Asset report

Sauget zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Zinc production commenced by the Evans Wallower Zinc Company at Sauget in 1929 but stopped in 1931 due to economic conditions. American Zinc Company restarted production in 1941. Following significant expansion to 73kt/a the plant was closed in 1971. In 1972 the plant was acquired by AMAX allowing it to close its horizontal distillation plant in Oklahoma. Big River Minerals Corporation purchased the smelter from AMAX in August 1988 and raised capacity to 80kt/a slab zinc. The...

What's included

This report contains

  • Document

    Sauget (Electrolytic) closed zinc smelter

    XLS 263.50 KB

  • Document

    Sauget zinc smelter

    PDF 790.60 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898