Asset report

Veles zinc smelter

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

The ISF smelter at Veles was commissioned in October 1973 with a capacity of 65kt/a ISF zinc and 35kt/a lead. In June 2003 the smelter was "temporarily" closed for an indefinite period. In 2008 Veles city council approved site clean up and redevelopment. However in 2009 the site was bought by Metrudhem who stated that they wanted to restart the smelter. There was much local opposition to the plan and the smelter did not restart. As such it is assumed that the smelter will never restart.

What's included

This report contains

  • Document

    Veles (ISF) closed zinc smelter

    XLS 260.50 KB

  • Document

    Veles zinc smelter

    PDF 1.11 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Process overview
  • Products
  • Timeline
  • Economic assumptions

Tables and charts

This report includes 2 images and tables including:

Images

  • Location maps: Image 1

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898