Asset report

Zanjan zinc smelter project

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about subscriptions

Already have subscription? Sign In

Further information

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

The smelting of Angouran ore and the minesite was first proposed in 2000 with a smelter likely to come on line in 2006. However the economics of selling the ore still outweigh the construction of a smelter, and so this project is very unlikely to go ahead.

What's included

This report contains

  • Document

    Zanjan zinc smelter project

    PDF 1.04 MB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
    • Location / Transport
    • Conc. Receipt / Storage
    • Roaster
    • Acid Plant
    • Leach Plant
    • Purification
    • Tankhouse
    • Casting Plant
    • Residue Disposal
  • Products

Tables and charts

This report includes 3 images and tables including:

Images

  • Location maps: Image 1
  • Flowsheet

Tables

  • Key facts: Table 1

You may be interested in

Asset report

Sungun copper mine

Asset report

Miduk copper mine

    
            
            
            
            
            
            
            
            
            
            
    

Questions about this report?

    • Europe:
      +44 131 243 4699
    • Americas:
      +1 713 470 1900
    • Asia Pacific:
      +61 2 8224 8898