Asset Report
Metates zinc mine project
Report summary
The project includes two different sites connected by a road and a 127km pipeline. The Metates mine site includes an ore open pit, crushing and milling facilities and flotation and thickener plant. The El Paso site includes a limestone quarry, autoclave facility, leaching facility, Merrill-Crowe plant, acid neutralisation tank, SX/EW plant. The estimated mine life is 17 years excluding pre-stripping but the plan is to operate for an additional 10 years by treating stockpile ores. The plant will produce zinc ingot, silver and gold dore.
Table of contents
- Summary
- Key Issues
-
Emissions
- Detailed Map
- CAPEX
- Mining
- Process
- Royalties and taxes
Tables and charts
This report includes 2 images and tables including:
- Metates Emission Intensity Quartile Ranking - Total global production - Tonnes Zn equivalent
What's included
This report contains:
Other reports you may be interested in
Asset Report
Horne 5 zinc mine project
A detailed analysis of the Horne 5 zinc mine project
$2,250
Asset Report
Back Forty zinc mine project
A detailed analysis of the Back Forty zinc mine project.
$2,250
Asset Report
Hilarion zinc mine project
A detailed production and cost competitive analysis of the Hilarion zinc mine project.
$2,250