Asset Report

Gilt Edge (Closed) gold mine

From

$1,350.00

You can pay by card or invoice

From

$1,350.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

A 2% royalty is currently payable on production. Starting early 1996 the Anchor Hill oxide deposit (7.8Mt @ 0.9g/t) was mined. Initially ore will be stacked on the existing on-off heap leach pads, but dedicated pads will be constructed as mining progresses.

What's included

This report contains

  • Document

    Gilt Edge (Closed) gold mine

    XLS 119.00 KB

  • Document

    Gilt Edge (Closed) gold mine

    PDF 819.93 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
    • Mining
    • Process
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Tables

  • Key facts: Table 1

Images

  • Detailed map

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4400
  • Americas:
    +1 713 470 1600
  • Asia Pacific:
    +65 6518 0800