A 2% royalty is currently payable on production. Starting early 1996 the Anchor Hill oxide deposit (7.8Mt @ 0.9g/t) was mined. Initially ore will be stacked on the existing on-off heap leach pads, but dedicated pads will be constructed as mining progresses. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.