Asset Report
Adaro Tutupan coal mine
Report summary
Adaro Tutupan is a large sub-bituminous thermal coal mine located within a 360 square kilometre concession area in the Tanjung district, South Kalimantan. The mine operates under a Generation I Coal Cooperation Agreement that was awarded on 16 November 1982 and convereted to an IUPK license in 2022. The Tutupan mine is operated as part of the Adaro complex which also includes the Wara and Balangan mines. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
- Key issues
- Emissions
Tables and charts
This report includes 14 images and tables including:
- Adaro Tutupan Emission Intensity Quartile ranking – total global production - saleable tonnes
- Detailed map
- Participation
- Coal seams
- Marketable reserves
- Production
- Production
- Operations
- Infrastructure
- Cash costs
- Cash costs
- Capital Costs
- Coal quality
- Economic assumptions
What's included
This report contains: