Asset Report

Ashton coal mine

Get this report*

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

The Ashton coal mine is located in the Hunter Valley of New South Wales, 15 kilometres north-west of Singleton. We cover the underground mine at Ashton in a separate asset report. The proposed re-start of operations at the south-east open cut is contained within mining leases MLA 394 and MLA 351. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Emissions

Tables and charts

This report includes the following images and tables:

  • Ashton Emission Intensity Quartile ranking – total global production - saleable tonnes
  • Detailed map
  • Participation
  • Coal seams
  • Marketable reserves
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash costs
  • Cash costs
  • Capital costs
  • 3 more item(s)...

What's included

This report contains:

  • Document

    Ashton coal mine

    PDF 1.58 MB

  • Document

    Coal asset - Ashton data - May 2024.xlsx

    XLSX 166.59 KB