Australia coal project tracker Q2 2022
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Executive summary
- Metallurgical coal
- Thermal coal
Tables and charts
This report includes the following images and tables:
-
Australian metallurgical coal project supply to 20262026 seaborne export metallurgical coal FOB cost curveAustralian thermal coal project supply to 20262026 seaborne export thermal coal FOB cost curve
What's included
This report contains:
Other reports you may be interested in
Woodlawn Restart zinc mine project
A detailed analysis of the Woodlawn Restart zinc mine project.
$2,250Talinga Area
The Talinga coal seam gas (CSG) field is located on a structural high called the Undulla Nose.
$3,720Spring Gully
Spring Gully is a coal seam gas (CSG) project located on the western edge of the Bowen Basin, Queensland.
$3,720