Australia coal project tracker Q2 2022
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
-
Executive summary
- Metallurgical coal
- Thermal coal
Tables and charts
This report includes the following images and tables:
- Australian metallurgical coal project supply to 2026
- 2026 seaborne export metallurgical coal FOB cost curve
- Australian thermal coal project supply to 2026
- 2026 seaborne export thermal coal FOB cost curve
What's included
This report contains:
Other reports you may be interested in
Lingshi (Alumina) alumina refinery
Lingshi was started in early 2016
$2,250Pohang POSCO (BOF) steel plant
POSCO's Pohang works ranks as one of the largest integrated steel plants in the world.
$2,250Port Pirie zinc smelter
A detailed analysis of the Port Pirie zinc smelter.
$2,250