Asset Report

Kideco Roto coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Kideco Roto is the largest mine within the Kideco Jaya Agung (Kideco) concession - one of the world's largest thermal coal export operations. The Kideco concession area is in the Pasir region of East Kalimantan and operates under a Generation I Coal Cooperation Agreement which was awarded on 14 September 1982. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
    • Production
    • Operations
    • Infrastructure
    • Capital costs

Tables and charts

This report includes 14 images and tables including:

  • Kideco Roto Emission Intensity Quartile Ranking – total global production - saleable tonnes
  • Detailed map
  • Participation
  • Coal seams
  • Marketable reserves
  • Production
  • Cash costs
  • Cash costs
  • Product quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Kideco Roto coal mine

    PDF 1.33 MB

  • Document

    Kideco Roto coal mine

    ZIP 1.04 MB

  • Document

    Kideco Roto-LIVE_Indonesia-BASE.XLS

    XLS 654.00 KB

  • Document

    Asset_Kideco Roto.xlsx

    XLSX 147.78 KB