Asset Report

Kuansing Inti Makmur coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

Kuansing Inti Makmur (KIM) is a sub-bituminous thermal coal mine, covering a 26 square kilometre area over eight adjacent concessions in the Jambi province of Sumatra. KIM is located about 300 kilometres to the south-east of the Padang Port in West Sumatra. The mine includes two pits - KIM East and KIM West - under Izin Usaha Pertambangan Produksi (IUPs) that were awarded in 2009 and 2010. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

Tables and charts

This report includes 14 images and tables including:

  • Kuansing Inti Makmur Emission Intensity Quartile Ranking – total global production - saleable tonnes
  • Detailed map
  • Participation
  • Coal seams
  • Marketable reserves
  • Production
  • Operations
  • Infrastructure
  • Cash costs
  • Cash costs
  • Capital Costs
  • Coal quality
  • Economic assumptions

What's included

This report contains:

  • Document

    Kuansing Inti Makmur coal mine

    PDF 1.30 MB

  • Document

    Kuansing Inti Makmur coal mine

    ZIP 1.05 MB

  • Document

    Coal asset - Kuansing Inti Makmur data - November 2023.xlsx

    XLSX 175.42 KB

  • Document

    Kuansing Inti Makmur-LIVE_Indonesia-BASE.XLS

    XLS 698.00 KB