Asset report

Kuansing Inti Makmur coal mine

Loading current market price

Get this report

Loading current market price

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Contact us about this report

Report summary

Kuansing Inti Makmur (KIM) is a sub bituminous thermal coal mine covering a 26 square kilometre area over eight adjacent concessions in the Jambi province of Sumatra. KIM is located about 300 kilometres to the south east of the Padang Port in West Sumatra. The mine operates two pits KIM East and KIM West under Izin Usaha Pertambangan Produksi (IUPs) that were awarded in 2009 and 2010.

What's included

This report contains

  • Document

    Asset Kuansing Inti Makmur.xls

    XLS 216.50 KB

  • Document

    Kuansing Inti Makmur-Indonesia-BASE.XLS

    XLS 559.00 KB

  • Document

    Kuansing Inti Makmur coal mine

    PDF 351.96 KB

  • Document

    Kuansing Inti Makmur coal mine

    ZIP 538.33 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Participation
  • Geology
  • Reserves and resources
  • Production
  • Operations
  • Infrastructure
  • Costs
  • Sales contracts
  • Economic assumptions

Tables and charts

This report includes 14 images and tables including:

Images

  • Detailed map
  • Cash costs
  • Production: Image 1

Tables

  • Key facts: Table 1
  • Coal seams
  • Marketable reserves
  • Operations
  • Infrastructure
  • Cash costs
  • Capital Costs
  • Coal quality
  • Economic assumptions
  • Participation: Table 1
  • Production: Table 1

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898