Asset Report

PTBA Banko Tengah coal mine

Get this report

$2,550

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Banko Tengah project forms part of PT Bukit Asam's (PTBA) Tanjung Enim complex in South Sumatra. The Banko Tengah area covers 254 square kilometres and has a very large reserve base. The mine will operate under an IUP mining permit. A low rank coal will be produced, with an energy content of approximately 4,200 kcal/kg (gar). Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key Issues
  • Emissions

Tables and charts

This report includes 14 images and tables including:

  • PTBA Banko Tengah Thermal Coal Emission Intensity Quartile Ranking - Total global production - Saleable tonnes
  • Detailed map
  • Participation
  • Coal seams
  • Marketable reserves
  • Production
  • Production
  • Operations
  • Infrastructure
  • Cash costs (US$/tonne)
  • Cash costs
  • Capital costs (US$ million)
  • Coal quality
  • Economic assumptions

What's included

This report contains:

  • Document

    PTBA Banko Tengah coal mine

    PDF 1.45 MB

  • Document

    PTBA Banko Tengah coal mine

    ZIP 1.17 MB

  • Document

    Coal asset - PTBA Banko Tengah data - November 2023.xlsx

    XLSX 182.65 KB

  • Document

    PTBA Banko Tengah-LIVE_Indonesia-BASE.XLS

    XLS 735.50 KB