Commodity Market Report
Europe gas infrastructure long-term outlook H2 2020
This report is currently unavailable
Report summary
TAP became operational along its full route, completing Europe’s Southern Gas Corridor. Construction on Nord Stream 2 stopped in December 2019 when US sanctions targeted the project's pipelaying vessels, and we now expect it to be commissioned in January 2022. After years of low regas capacity utilisation, LNG imports into Europe were high in 2020. Despite the coronavirus impact on demand Europe imported 84 Mt in 2020, equivalent to 47% utilisation, only 1% lower than 2019. Seasonal price spreads at European gas hubs were higher in 2020 than previous years. This resulted in record storage inventories by October of 111 bcm, including 10 bcm in Ukraine targeting the European market. Find out about these and other major developments in our latest European gas infrastructure report .
Table of contents
- European pipeline developments
- Import pipeline developments
- Baltic / Central Europe interconnectors
- Southern Europe interconnectors
- Western Europe interconnectors
- Other pipeline infrastructure developments
- Transportation tariffs
- Historical capacity developments since 2010
-
Capacity outlook
- Future capacity development
- Existing infrastructure
- Recent terminal developments and infrastructure under construction
- Proposed terminals
- Growth in regasified LNG (RLNG) demand
- FSRUs
- Trans-shipments and reloads
- Other services
- Example of tariff calculation: Cartagena
Tables and charts
This report includes 26 images and tables including:
- Existing gas storage infrastructure
- Europe gas storage summary table 2020
- Regulation of gas storage in different markets
- Storage capacity vs days' cover
- Storage closures
- Days' storage cover by country - 2020
- Aggregate European storage capacity outlook H2 2020
- Cumulative storage capacity change
- Projects under construction or planned
- Active conventional scale regasification terminals
- Regas capacity by country
- Historic Utilisation
- Forecast utilisation
- Pre-FID terminals in Europe
- Regas capacity by status
- Contracted vols v regas capacity
- Conventional and small-scale+ LNG terminals
- Terminal tariffs
- Example regas tariff calculation
What's included
This report contains:
Other reports you may be interested in
Asset Report
Mariner
The Mariner heavy oil field lies in the UK northern North Sea,100 kilometres east of the Shetland Islands. Unocal discovered the field ...
$4,400
Country Report
Portugal upstream summary
No production so a reliance on imports - There have been no commercial discoveries in Portugal. As such, domestic oil and gas ...
$3,400
Asset Report
Perenco-operated fields
Perenco operates an onshore portfolio of more than 10 fields in southeast Türkiye (Turkey), in the Southeast Turkey Foldbelt ...
$3,100