Asset Report

Etki FSRU- LNG regas terminal

From

$700.00

You can pay by card or invoice

From

$700.00

You can pay by card or invoice

Get this Asset Report as part of a subscription

Enquire about subscriptions

Already have a subscription? Sign In

Further information

Pay by Invoice or Credit Card FAQs

Contact us

Submit your details to receive further information about this report.

  • An error has occurred while getting captcha image
For details on how your data is used and stored, see our Privacy Notice.
 

Report summary

Turkey's third regasification terminal, located at Aliaga, was commissioned in December 2016. The terminal was Turkey's first FSRU (floating storage and regasification unit). The project was completed in less than seven months after the final investment decision and the FSRU was constructed by Samsung Heavy Industries. The terminal is operated by Etki Port Operations Natural Gas Import and Trade.

What's included

This report contains

  • Document

    Etki FSRU- LNG regas terminal.xls

    XLS 159.00 KB

  • Document

    Etki FSRU- LNG regas terminal

    PDF 5.72 MB

  • Document

    Etki FSRU- LNG regas terminal

    ZIP 5.76 MB

Table of contents

  • Key facts
  • Location maps
  • Terminal overview
  • Utilisation
  • Operational basis
  • Offtake
  • Tariffs
  • Future expansions

Tables and charts

This report includes 7 images and tables including:

Tables

  • Key facts: Table 1
  • Key facts: Table 2
  • Key facts: Table 3
  • Tariffs: Table 1
  • Tariffs: Table 2

Images

  • Map
  • Approximate Monthly Import Data by Country

You may be interested in

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898