Indonesia LNG long-term outlook 2019
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- LNG supply-demand
- Implications of the Pertamina-PGN merger
- Policy
- Regas
- Upstream gas developments
- Abadi and Sengkang slowly progressing
- Infrastructure access
-
Current LNG status and access
- Other existing LNG infrastructure
-
Future LNG terminal development
- Under construction
- Large-scale regas
- Small-scale regas
- Proposed
- Large-scale regas
- Small-scale regas
- Cancelled
- Large-scale regas
- 1 more item(s)...
- Domestic volumes
- International volumes
- Future supply
- 8 more item(s)...
Tables and charts
This report includes the following images and tables:
- Overcontracted volumes
- Infrastructure map
- Regional map
- LNG import terminals
- Terminals by region
- Proposed terminals
- LNG throughput by regas terminal
- LNG supply position vs LNG demand and regasification capacity
- LNG throughput by source
- Seasonality
- Regas facilities ownership
- Liquefaction facilities ownership
- 11 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Huayou Nickel Cobalt HPAL nickel operation
A detailed analysis of Huayue Nickel and Cobalt HPAL nickel operation
$2,250Mukah aluminium smelter
A detailed analysis of the Mukah aluminium smelter.
$2,250Abu Dhabi FSRU - LNG regas terminal
Abu Dhabi's first LNG import terminal - Express FSRU with 500 mmcfd capacity, operational since 2016, owned by ADNOC Gas Processing.
$1,450