Japan LNG long-term outlook 2020
This report is currently unavailable
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Contracting trends
- Contract outlook
-
Short-term outlook ( 2020-2021 )
- 2020 and the Covid-19 outbreak
- 2021-2022
- Coal-to-gas switching
-
Long-term outlook (2021- 2040)
- Power demand
- Nuclear outlook
- Non-power demand
- Residential/Commercial
- Industry
- Energy security remains at the heart of Japanese energy policy in the post-Fukushima era
Tables and charts
This report includes the following images and tables:
- Northeast Asia oil-indexation trend
- Contracted LNG supply by source
- Contracts vs LNG imports
- Contracted LNG supply position by buyer
- Japan regional map - areas of high population and energy demand
- Gas demand and imports (2015-2040)
- Japan LNG demand (monthly)
- Stock levels
- Short-run coal-to-gas switching curve
- Power generation mix
- Nuclear restarts
- Japan electricity and gas liberalisation timeline
- 1 more item(s)...
What's included
This report contains:
Other reports you may be interested in
Yulin aluminium smelter
A detailed analysis of the Yulin aluminium smelter.
$2,250Mukah aluminium smelter
A detailed analysis of the Mukah aluminium smelter.
$2,250Ziar Nad Hronom aluminium smelter
A detailed analysis of the Ziar Nad Hronom (P) aluminium smelter.
$2,250