Asset Report

Masela (Abadi LNG) - Commercial Overview

Get this report

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

The Masela PSC contains the giant Abadi gas field, located in the Timor Sea. The field was discovered by INPEX in 2000. Appraisal drilling in 2007-2008 and 2013-2014 confirmed recoverable resources in the region of 21 tcf of gas.In May 2008, a Plan of Development (PoD) for Abadi was submitted, consisting of two development options: piping gas to a greenfield onshore LNG plant, or constructing an offshore floating LNG (FLNG) facility. The FLNG option was preferred and the PoD was approved ...

Table of contents

  • Key facts
    • Summary
    • Key issues
    • Links to related report
  • Commercial structure
    • Exploration
    • Development planning
  • LNG output
  • LNG contracts
  • Shipping
  • Economic analysis

Tables and charts

This report includes 9 images and tables including:

  • Key facts: Table 1
  • Commercial structure: Image 1
  • Timeline: Table 1
  • LNG output: Image 1
  • Summary economics
  • Breakeven economics (US$/mmBtu)
  • FOB breakeven analysis (post-tax)
  • Indonesia Map
  • Masela (Abadi LNG) Map

What's included

This report contains:

  • Document

    Commercial Overview

    PDF 6.86 MB