Nigeria LNG (NLNG) - NLNG Expansion Commercial Overview
*Please note that this report only includes an Excel data file if this is indicated in "What's included" below
Report summary
Table of contents
- Key facts
-
Summary and key issues
- Summary
-
Key issues
- Feedgas availability
- Petroleum Industry Act
- Offtake
- Development
- Costs
-
Commercial structure
- Upstream supply obligations
- Timeline
- LNG output
- LNG contracts
-
Shipping
-
Fiscal and regulatory
- Royalty
- Tax holiday
- Tax rate
- Interest on loans
- Capital allowances
- Economic assumptions
- Liquids pricing
-
LNG pricing
- Europe
- Asia
- Feedgas pricing
- GEM files
-
Fiscal and regulatory
- Economic analysis
Tables and charts
This report includes the following images and tables:
- Key facts: Table 1
- NLNG Expansion
- Timeline: Table 1
- NLNG Expansion output
- NLNG Expansion contracts
- LNG contracts: Table 1
- Shipping: Table 1
- Summary economics
- Breakeven economics (us$/mmbtu)
- Economic analysis: Image 1
- NLNG feedgas obligations for each JV by plant
What's included
This report contains:
Other reports you may be interested in
Nigeria LNG (NLNG) - NLNG Base Commercial Overview
NLNG Base is a two train LNG plant, which was the first to export LNG from Nigeria in 1999.
$2,250Pluto LNG Expansion - Commercial Overview
Woodside is planning to build a 5 mmtpa brownfield expansion train connected to the existing Pluto LNG plant.
$2,700Oman LNG - Oman LNG - commercial overview
The foundation development at Oman LNG consisted of trains 1 & 2 each with 3.6 mmtpa capacity.
$2,700