Asset Report
North Field East - Commercial Overview
Report summary
In April 2017, Qatar announced the lifting of the moratorium on new North Field developments, which had been in place since 2005. Initially a 2 bcfd project was proposed, but this was later replaced with a 4.5 bcfd upstream development in 2018. The production increase resulted in the project being expanded to include four new 8 mmtpa trains, allowing Qatar to increase its LNG export capacity from 77 to 110 mmtpa. The Final investment decision (FID) on the project was taken in February 2021
Table of contents
- Key facts
-
Summary and key issues
- Summary
- Key issues
- Links to related reports
- Commercial structure
- Timeline
- LNG output
- LNG contracts
- Shipping
-
Economic analysis
- Cash Flow
- Discount rate and date
- Inflation rate
- LNG price
- Gas price
- Condensate price
- Global Economic Model (GEM) File
Tables and charts
This report includes 7 images and tables including:
- Key facts: Table 1
- Timeline: Table 1
- LNG output: Image 1
- Summary economics
- Breakeven economics (US$/mmBtu)
- Index Map
- Detail Map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Ichthys LNG - commercial overview
Ichthys is a giant gas/condensate field located in the Browse Basin, around 440 kilometres north of Broome, offshore Western Australia.
$2,250
Asset Report
Elba Liquefaction Project - Commercial overview
Elba Island LNG is a ten-train development on the site of the existing Elba Island regas facility near Savannah, Georgia, on the US ...
$2,250
Asset Report
Cove Point LNG Export - Commercial Overview
Cove Point LNG is an operational single-train liquefaction facility on the site of the existing Cove Point LNG regas project in ...
$2,250