Asset Report
Tangguh LNG - Tangguh
Report summary
The Tangguh LNG project, located in the Bintuni Bay area of West Papua is Indonesia's third LNG-producing centre after Bontang and Arun, was brought online in July 2009 with a nameplate capacity of 7.6 mmtpa. The plant and the Tangguh Joint Venture partnership, comprising the Berau, Muturi and Wiriagar PSCs, is operated by BP, the largest stakeholder in the project. The site has two operational onshore trains of 3.8 mmtpa each. There has been debottlenecking on both trains and output ...
Table of contents
- Key facts
-
Summary and key issues
- Key issues
- Project structure
- Timeline
- Seasonal output
- Shipping
- Economic assumptions
Tables and charts
This report includes 3 images and tables including:
- Key facts: Table 1
- Timeline: Table 1
- Approximate Historical LNG Monthly Supply Volumes by Destination
What's included
This report contains:
Other reports you may be interested in
Asset Report
Tangguh LNG - Phase 1 Commercial Overview
The Tangguh LNG project, located in the Bintuni Bay area of West Papua is Indonesia's third LNG-producing centre after Bontang and ...
$2,250
Asset Report
Tangguh LNG - Phase 2 Commercial Overview
The Tangguh LNG project, located in the Bintuni Bay area of West Papua is Indonesia's third LNG-producing centre after Bontang and ...
$2,250
Asset Report
Tangguh (LNG)
Largest gas producing asset in Indonesia is expecting first gas from Expansion phase and will FID a CCUS-EGR facility
$5,750