Asset Report
Afton-Ajax Restart copper mine
Report summary
This analysis of the Afton-Ajax Restart Project assumes an on open pit mining operation with a 65kt/d processing plant and is based on the updated Feasibility Study released in Q1 2016, reflecting scope changes and revised project economics. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Power
- CAPEX
- Mining
- Process
Tables and charts
This report includes 1 images and tables including:
- Detailed map
What's included
This report contains:
Other reports you may be interested in
Asset Report
Kipushi Restart copper mine
A detailed analysis of the Kipushi Restart copper mine.
$2,250
Asset Report
Wolverine Restart copper mine project
A detailed analysis of the Wolverine copper mine.
$2,250
Asset Report
Prieska Restart copper mine
A detailed analysis of the Prieska Restart copper mine project.
$2,250