Asset Report

Al Masane copper mine

Get this report*

$2,250

You can pay by card or invoice

For details on how your data is used and stored, see our Privacy Notice.
 

- FAQs about online orders
- Find out more about subscriptions

*Please note that this report only includes an Excel data file if this is indicated in "What's included" below

Construction commenced in July 2009 and was reported to have been completed in November 2011. While current reserves are sufficient for a 10 year mine life, AMAK has mining rights on a number of others deposits in the area which, if exploited, could considerably lengthen the mine life. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.

Table of contents

  • Summary
  • Key issues
  • Mining
  • Process

Tables and charts

This report includes 1 images and tables including:

  • Detailed map

What's included

This report contains: