Albyn is an open pit operation that utilises conventional mining methods. Mineralisation is suitable for free milling. Access to the property via Zlatoustovsk is by all weather roads with connections to the Baikal-Amur Railway Line. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.