Asset report

Bannockburn (Closed) gold mine

From

$1,350.00

Get this report

From

$1,350.00

Get this report as part of a subscription

Enquire about Subscriptions

Already have subscription? Sign In

Further information

FAQs

Contact us

Report summary

Initially Bannockburn ore was trucked to Tower Hill mill near Leonora. In 1991 the plant from the Gabanintha mine was moved onto the Bannockburn site. Mining restarted in September 1991 on stockpiled material and reached full 600kt capacity in its first full year of operation.

What's included

This report contains

  • Document

    Bannockburn (Closed) gold mine

    XLS 120.50 KB

  • Document

    Bannockburn (Closed) gold mine

    PDF 374.11 KB

Table of contents

  • Key facts
  • Summary and key issues
  • Location maps
  • Geology
  • Operations
  • Timeline

Tables and charts

This report includes 2 images and tables including:

Images

  • Detailed map

Tables

  • Key facts: Table 1

You may be interested in?

Questions about this report?

  • Europe:
    +44 131 243 4699
  • Americas:
    +1 713 470 1900
  • Asia Pacific:
    +61 2 8224 8898