Asset Report
Baotou (P) aluminium smelter
Report summary
With the permanent closure of the Søderberg lines in 2004, Baotou became an exclusively prebake operation. We assume start-up of the 150kt/a expansion (taking capacity to 550kt/a) around 2014-2015. Wood Mackenzie’s asset reports are built from the bottom up, incorporating a number of granular data metrics to ultimately produce our industry standard cash operating costs. This report contains a detailed asset note giving you a holistic view of the asset, including an operational overview through to a timeline of events from inception to now. This qualitative analysis is supplemented by the associated Excel download which enables interrogation of a whole series of cost and production metrics over the life of the asset.
Table of contents
- Summary
-
Key issues
- Detailed map
- Alumina Sources
- Anode Source
-
Power
- Power Type
- Power Source
- Power Supplier
- Power Contract
Tables and charts
This report includes 2 images and tables including:
- Baotou (P) Emission Intensity Quartile ranking – total global production - tonnes aluminium
What's included
This report contains:
Other reports you may be interested in
Asset Report
Jiaozuo Wanfang (P) aluminium smelter
A detailed analysis of the Jiaozuo Wanfang (P) aluminium smelter.
$2,250
Asset Report
Liancheng (P) aluminium smelter
A detailed analysis of the Liancheng (P) aluminium smelter.
$2,250
Asset Report
Nag Hammadi (P) aluminium smelter
A detailed analysis of the Nag Hammadi (P) aluminium smelter.
$2,250